Showers, walk-in tubs, safety fittings
A walk-in tub is one option. Sometimes it is the wrong one.
We convert bathtubs to curbless showers, install walk-in tubs where they genuinely suit the room, and anchor grab bars into something that will hold. One written quote, no same-day discount, and no salesperson at your kitchen table after dark.

One written quote
Itemised, left with you, and still valid tomorrow. No discount that expires when we leave the driveway.
No same-day close
We will not ask for a signature at the kitchen table. Read it, sleep on it, show it to whoever you want.
No health claims
We describe what a fitting does physically. We do not tell you what it prevents, because that is not ours to promise.
Three ways to make a bathroom usable
They are not equivalent, and they are not interchangeable. Which one fits depends on the room, the doorway and how the bathroom is actually used.

Convert the tub to a curbless shower
Nothing to step over, room for a seat, room for someone to help. The work happens under the floor, which is why it is quoted after a survey.
What it involves→
Install a walk-in tub
Right for someone who wants to bathe and finds the tub wall the obstacle. Wrong for most people who shower, and we will say so.
What it involves→
Grab bars and safety fittings
The cheapest useful change, and the one most often done badly. What the bar is anchored into decides everything.
What it involves→
Why quotes differ so much
A level shower floor is a change to the structure
For the shower floor to finish level with the bathroom floor and still drain, the subfloor underneath has to be recessed. Whether that is straightforward or structural depends on which way your joists run and how deep they are, and neither is visible from inside the bathroom.
That is the honest reason two bids for the same shower can differ by a multiple, and the reason we do not quote one over the phone.
Four questions, and none of them about money or health
We do not ask your budget, because a quote asked to fit a number will fit it. We do not ask about anyone’s health, because it is not a form’s business and it changes nothing about the tiling.
Senior Bath Quote converts bathtubs to curbless showers, installs walk-in tubs, and fits grab bars and other safety modifications. One written quote, no same-day discount, no in-home close.
- One call, by a person, dialed by hand.
- A survey of the room before any number is said out loud.
- A written quote you keep, whether or not you use us.
What the work actually is
The floor decides, and it is built before it is tiled

Before
A high-walled tub in a small room. Nothing here is broken, which is why the decision gets postponed until a fall or a discharge from hospital forces it.

During
The tub is out and the floor is open. This is the part no photograph on a brochure shows, and the part that decides whether the finished floor drains: the slope is built here, not tiled on afterwards.

After
Tile runs level from the room into the shower, so nothing has to be stepped over. The bench and the bar are anchored into solid blocking put in while the wall was open.
What gets built
Five bathrooms, five different problems
The part you never see
Tile is the part you choose and the part you are shown. The waterproofing behind it, and the slope built into the mortar bed under it, are what decide whether the room is still dry in five years. Both are finished before anyone sees a sample.
Three questions that come up every time
Is a walk-in tub the best option?
Often it is not. It suits someone who wants to bathe and finds climbing over the tub wall the specific difficulty. If the person showers, or may use a walker later, removing the tub usually gives a better result for the same money. The two are compared on tub versus shower.
Why is there no price on this site?
Because the room decides it, and the part that decides it most is under the floor. A number published here would become the figure a real quote is judged against. What makes up a quote is set out on cost factors.
Will someone come to the house to sell to me?
Someone will come to measure, and they will leave a written quote. They are not paid on commission and they will not produce financing paperwork. What a pressure visit looks like, in detail, is on choosing an installer.





